From: Cost recovery of NGO primary health care facilities: a case study in Bangladesh
Assets | IPD% (US$) | OPD% (US$) | Total% (US$) |
---|---|---|---|
Furniture | 13.81 (880.29) | 26.40 (901.92) | 18.21 (1782.22) |
Equipment & machinery | 77.81 (4959.40) | 4.71 (161.05) | 52.30 (5120.45) |
Pathology lab items | 0.00 (0) | 54.93 (1876.42) | 19.17 (1876.42) |
Vehicles | 1.40 (89.29) | 2.61 (89.29) | 1.82 (178.59) |
Others | 6.97 (444.41) | 11.34 (387.52) | 8.50 (831.93) |
Total (annualized) | 100 (6373.40) | 100 (3416.21) | 100 (9789.61) |